Our Contribution to Build a Nation
Hybrid Annuity, EPC and departmental works across highways, bridges, roads and institutional buildings — currently in progress and completed.
IN PROGRESS
Projects in progress
Combined value of ongoing work under execution: approximately ₹1,102 Crore.
In ProgressHAM · NHAI · NH748A4L Highway, Belagavi–Hungund–Raichur (Pkg‑1)
▾
Design chainage 0.000 to 43.800 of NH748A executed under NHAI's Hybrid Annuity Mode. Project length 43.8 km, Package‑1 of the corridor.
In ProgressEPC · MSIDCPN‑II (16A) — Shirala–Walwa Road (MDR‑1)
▾
Improvement and widening of MDR‑1, Km 0/00 to 29/700, in Taluka Walwa, District Sangli, executed on EPC mode for the Maharashtra State Infrastructure Development Corporation.
In ProgressEPC · Municipal CouncilPandharpur City Roads
▾
Comprehensive urban road improvement package for Pandharpur Municipal Council, District Solapur.
In ProgressMMGSYRD‑SAN‑A283 — 8 Roads, Walwa
▾
Eight individual road works bundled under the Mukhyamantri Gram Sadak Yojana in Taluka Walwa, District Sangli.
In ProgressMMGSYRD‑SAN‑A284 — 12 Roads, Walwa & Shirala
▾
Twelve individual road works bundled under the Mukhyamantri Gram Sadak Yojana across Talukas Walwa and Shirala, District Sangli.
In ProgressPWD (West) Division, SataraTarali River Bridge, Indoli
▾
MDR‑82 at Km 1/250, near Indoli village — built to the contractor's own design and drawings.
In ProgressPWD Division, SataraYerala River Submersible Bridge, Morale
▾
MDR‑42 at Km 25/000 near Morale village, on the Nandoshi Aundh Palshi Nimsod Morale road.
DELIVERED
Completed projects
23 major works handed over to date, worth approximately ₹611 Crore, spanning highways, roads, bridges and buildings.
CompletedHAM · SH‑140PN-37 — Dhamner to Vita Road (SH-140)
▾
2‑laning with paved shoulder, Km 01/000 to 131/600 (Part II — Dhamner to Vita, Km 72/360 to 130/520) plus 1.00 km Pusesawali diversion. Client: Exe. Engg., PW (West) Division, Satara.
CompletedHAM · SH‑144PN-38-Pachwad Phata Yenpe Kokrud Road (SH-144)
▾
2‑laning with paved shoulder, including improvement of roads connecting Satara's tourist destinations (Kas Plateau). Client: Exe. Engg., PW (West) Division, Satara.
CompletedHAM · SH‑150PN‑46 — Kokrud–Anuskura Road (SH‑150)
▾
District border to Anuskura district border, Km 84/400 to 133/400 (Section Kokrud to Anuskura, Km 83/700 to 133/400). Client: Exe. Engg., S.P. (PW) Division, Kolhapur.
CompletedEPC24(B) · SH‑158Shirshi to Wakurde (SH-158)
▾
Section Shirshi to Wakurde, Km 112/620 to 117/250, Taluka Shirala, District Sangli.
CompletedMDR‑10Bhurakawadi to Aundh (MDR-10)
▾
Km 68/600 to 83/400 (Part Bhurakawadi to Aundh), with construction of RCC gutter, Taluka Khatav, District Satara.
CompletedSH‑143 · 3 PackagesMalharpeth to Pandharpur Road (SH143)
▾
Three linked packages: (A) Km 12/700–18/300 Shivade Phata to Koregav Phata; (B) RCC gutter, Km 18/300–21/000, Koregav Phata to Masur Police Station; (C) widening, Km 21/000–24/400, Masur PS to Riswad.
CompletedNH Division, KolhapurPatan–Helwak Rigid Pavement Road
▾
1.4 km of rigid (concrete) pavement, Taluka Patan, District Satara, executed for the NH Division, Kolhapur.
CompletedMDR‑10Rahimatpur–Bramhapuri Road (MDR‑10)
▾
Section Rahimatpur to Bramhapuri, Km 0/100 to 5/400, Taluka & District Koregaon-Satara.
CompletedMDR‑95Vaduj–Kumathe Road (MDR‑95)
▾
Part Kumathe to SH‑147, Km 3/00 to 10/500, with construction of RCC gutter, Taluka Khatav, District Satara.
CompletedMDR‑38Nadhaval–Nimsod Road (MDR‑38)
▾
Section Nadhaval to Nimsod (District Border), Km 34/00 to 39/00, Taluka Khatav, District Satara.
CompletedMDR‑43Gursale–Ambawade Road (MDR‑43)
▾
Section Gursale to Ambawade, Km 5/00 to 10/00, Taluka Khatav, District Satara.
CompletedMDR‑14Islampur–Kameri Concrete Road (MDR‑14)
▾
Km 20/00 to 24/600 (Part — Islampur to Kameri), Taluka Walwa, District Sangli.
CompletedMDR‑2Gudhe–Pachagani–Meni Road (MDR‑2)
▾
Km 52/00 to 72/400, Taluka Shirala, District Sangli.
CompletedMDR‑42Nandoshi–Morale Road (MDR‑42)
▾
Km 0/00 to 6/00, Taluka Khatav, District Satara.
CompletedIrrigation StructureK.T. Weir at Nandgaon
▾
Kolhapur-Type weir constructed across a river channel for irrigation water regulation.
CompletedDepartmentalMajor Bridge at Wathar
▾
Multi-span RCC bridge over a river crossing at Wathar, Karad.
CompletedDepartmentalMajor Bridge at Kale (Sanjaynagar)
▾
Approach-road bridge with guard-rail protected embankments at Kale, Sanjaynagar.
CompletedDepartmentalBridge on Nadhval–Ambewadi Road
▾
Rural link bridge connecting Nadhval and Ambewadi villages, guard-rail protected on both approaches.
CompletedMSPHS MumbaiGymnasium Hall at Turchi
▾
Institutional sports infrastructure at Mauje Turchi, Taluka Tasgaon, District Sangli.
CompletedPW (West) Division, SataraLate. Venutai Chavan Hospital Quarters at Karad
▾
Staff residential quarters constructed within the hospital premises at Karad.
CompletedInstitutionalITI College Girls Hostel at Karad
▾
Multi-storey girls' hostel building for the ITI College campus at Karad.
CompletedInstitutionalBoys Hostel at Parle
▾
Residential hostel block built for student accommodation at Parle.
CompletedInstitutionalKrishna Agri. College at Rethare Bk.
▾
Academic block constructed for the Agriculture College at Rethare Bk.